Applicable to SunDAT Pro
Overview
The Design Hierarchies is the DC electrical configuration for the region starting from the region level->inverter enclosure->inverter->combiner box(central inverters only)->string. Here you will be able to assign which strings go which equipment which will inform the BOM and wire schedule.
Interface
Central Inverter
- Search bar for equipment
- Toggle to choose the starting point for assigning strings when more than one string/block is selected
- Hierarchy-Region Level
- Actions and settings for region
- Hierarchy-Inverter Enclosure level
- Notification - Data from the inverter enclosure has not been added to the BOM
- Color identification of the inverter enclosure in model
- Status of Inverter Enclosure has been placed in the model (red = not placed yet, green = placed in model)
- Number of strings that have been assigned/Number of strings that can be added to inverter enclosure
- Quantity of this inverter enclosure placed in model
- Notification - Inverter enclosure's slot has not been filled
- Actions and settings for inverter enclosure
- Hierarchy-Inverter level
- Notification - Data from the inverter has not been addedto the BOM
- Color identification of the inverter in model
- Status of Inverter has been placed in model (red = not placed yet, green = placed in model)
- DC/AC ratio for the inverter
- Number of strings that have been assigned/Number of strings that can be added to inverter
- Quantity of this combiner placed in model
- Notification - Inverter's slots has not been filled
- Actions and settings for inverter
- Hierarchy-Combiner box level
- Notification - Data from the combiner box has not been added to the BOM
- Color identification of the combiner box in model
- Status of combiner box has been placed in model (red = not placed yet, green = placed in model)
- Actions and settings for combiner box
- Hierarchy-String level
- Status of string assigned to slot (red = not assigned, green = assigned)
- Actions and settings for the string
String Inverter
To be updated soon
Learn More
FAQ/Troubleshooting
To be updated soon
Related
- Create Design
- Wire Schedule
- Roof Stringing
- DC Electrical FAQS